The Ebbw Valley Railway (Template:Lang-cy) is a branch line of the Great Western Main Line in South Wales. Arriva Trains Wales provides an hourly passenger service each way, between Ebbw Vale Parkway and Cardiff Central.

The line was opened by the Monmouthshire Railway and Canal Company and the Great Western Railway (GWR) operated a passenger service from the 1850s between Newport and Ebbw Vale. The line became part of British Railways' Western Region in 1948, following the nationalisation of the railways. Passenger services were withdrawn in 1962 however, the route continued to be used to carry freight to and from the Corus steelworks in Ebbw Vale, until its closure in 2002. Proposals to re-open the existing freight railway line to passenger services were first mooted in 1998. The Welsh Assembly Government announced their commitment to the project in 2002, as part of a package of measures to help the steel communities.

Passenger services were restored to the line in February 2008, after a gap of 46 years, using Class 150 diesel multiple units.[1] Predominantly single track north of Newport, the Ebbw Valley Railway runs Template:Convert along the Ebbw River valley from Ebbw Vale, before joining the South Wales Main Line at a triangular set of junctions in Newport – the line splitting at Park Junction with the eastbound section joining at Gaer Junction and the westbound section joining at Ebbw Junction. The line's stations and services are managed by Arriva Trains Wales.

Current service[]

File:Lle aros, gorsaf Glyn Ebwy.JPG

Waiting area with self-service ticket machine
at Ebbw Vale Parkway

The Ebbw Valley Railway provides an hourly (two hourly Sundays) passenger service between Ebbw Vale Parkway and Cardiff Central.[2][3] Approximate journey duration between Ebbw Vale Parkway and Cardiff Central is 57 minutes.[4] Intermediate stations (their approximate journey times from Ebbw Vale Parkway are shown in brackets) are Llanhilleth (8 minutes), Newbridge (14), Crosskeys (22), Risca and Pontymister (27) and Rogerstone (31).[4] Dedicated feeder bus services link the line to Ebbw Vale and Abertillery town centres, from Ebbw Vale Parkway and Llanhilleth respectively.[5]

Actual passenger numbers greatly exceed forecasts. In 2002, passenger journeys were forecast at 22,000 per month. Whereas by 2008, 44,000 journeys had been made on the service each month; also exceeding the monthly target of 33,000 set for 2012. In August 2008 Trish Law, Assembly Member for Blaenau Gwent, said she had received "many complaints of standing-room only and grossly overcrowded trains". Arriva Trains Wales provide extra carriages at busy times, Saturdays and holidays, to cope with the demand.[6] Passenger journeys had exceeded 55,000 per month by May 2009, and by October 2009, over one million passenger journeys had been made on the line in the 20 months since its opening, comfortably exceeding the fourth-year target of 453,000.[7][8][9]

Network Rail own and manage the track and signalling; stations and services are operated by the existing train operating company, Arriva Trains Wales; and the local authorities each own and operate the station car parks in their area.[10] Each station has at least one Passenger Help Point and all stations and car parks have CCTV.[11] All stations on the branch are unstaffed, and at first lacked any ticket issuing facilities;[12] but in late 2009 a Scheidt & Bachmann Ticket XPress self-service ticket machine was installed at each station.[13][14]

History[]

Background[]

Template:Monmouthshire Railway and Canal The line has its origins in the tramways and waggonways constructed to serve the various iron works in the upper Ebbw Valley to enable them to receive raw materials and dispatch products. Developments included:

  • Rassa Railroad: a tramway built in 1794 to connect the Sirhowy Ironworks to the Beaufort Ironworks, and connected them to several limestone quarries at Trevil.[15][16]
  • Llanhiledd Tramroad: from Crumlin (low level) north to Ebbw Vale.[17]
  • Sirhowy Tramroad: a Template:Convert plateway which opened in 1805 and ran from ironworks at Tredegar and Sirhowy to the Monmouthshire Canal.Template:Sfn By 1805, a Template:Convert stretch of tramline had been laid to transport coal and iron ore to Newport Docks, laid jointly by Tredegar Iron and Coal Company and the Monmouthshire Canal Company. Pulled by teams of horses, in 1829 Chief Engineer Thomas Ellis was authorised to purchase a steam locomotive from the Stephenson Company. Built at Tredegar Works, it made its maiden trip on 17 December 1829.Template:Citation needed Due to its success, conversion to standard gauge was delayed until 1860 but, after reopening in 1865, it found that the traffic had been lost to its competitors.Template:Sfn The line was worked by the London and North Western Railway from 1 July 1875 and taken over by the railway company the following year.Template:Sfn[18]
  • Blaenavon Tramroad: a Template:Convert edge-railway opened in 1795-6 which linked the Blaenavon Ironworks with the Monmouthshire Canal at Pontnewydd.Template:Sfn It was rebuilt in 1829 as a Template:Convert gauge plateway.Template:Sfn

The Monmouthshire Railway and Canal Company was incorporated on 31 July 1845 and, having acquired the Blaenavon Tramroad in the same year, it rebuilt and extended the line, which re-opened from Pontypool to Blaenavon (North) on 2 October 1854.Template:Sfn Two short and steep branches to Cwmfrwdoer and Cwmnantddu were opened in 1870, with a third to Abersychan and Talywain in 1879.Template:Sfn A 99-year lease of the line was granted to the Great Western Railway from 1 August 1875 and the railway company acquired the line on 1 August 1880.Template:Sfn

Operations[]

The first passenger service on the line began on 21 December 1850, between Newport Courtybella and Blaina. The line was extended south to Newport Dock Street on 4 April 1852, and the northern extension from Aberbeeg to Ebbw Vale opened on 19 April 1852. Journeys between Ebbw Vale and Newport normally required passengers to change at Aberbeeg, although some services were direct.[19] It was a branch line of the Great Western Railway (GWR), until the nationalisation of the railways under the Transport Act 1947, when the line became part of the Western Region of British Railways on 1 January 1948. The line closed to passenger traffic on 30 April 1962, prior to the Beeching Axe, with the mineral branches following on 7 April 1969 and the Talywain branch on 3 May 1980.Template:Sfn

Freight services to and from the steelworks at Ebbw Vale continued until the site closed on 5 July 2002. The final freight service to run from the Corus steelworks in Ebbw Vale in 2003 removed scrap metal from site.[20][21][22][23]

Revival[]

Proposals[]

Peter Law, the former Assembly Member (AM) for Blaenau Gwent, had been calling for passenger services between Ebbw Vale and Newport to resume on the line since the 1980s, while he was still a councillor.[24] An initial feasibility study of the proposal was carried out for Blaenau Gwent council by infrastructure project management company Capita Symonds in 1998.[25] Stations at Ebbw Vale, Cwm, Aberbeeg, Abercarn, Risca and Maesglas were suggested,[26] and the plans included running some trains to Cardiff Central via a new station at Celtic Lakes on the South Wales Main Line.[27] Law made fighting for the line's re-opening one of his major election promises during the National Assembly for Wales election campaign in 1999.[24] A plaque at Ebbw Valley Parkway commemorates Law, who died in 2006, and his work to re-open the line. It was unveiled by Jocelyn Davies AM on 10 December 2007, four days before the Ebbw Valley Railway's planned official re-opening.[28]

File:Orsaf Parcffordd Glyn Ebwy 2010.JPG

Ebbw Vale Parkway railway station

In February 2001 the Rail Development Society Wales, a passengers' campaign group now campaigning as Railfuture Cymru/Wales, called for the rail link between Ebbw Vale and Newport to be reopened to help with the regeneration of what it called "already a socially deprived area". The plea followed Corus Group's announcement that it would close its Ebbw Vale steelworks operation. British Steel had employed 14,500 people at their main steel mills in Ebbw Vale in the 1960s. The mills closed completely during the 1980s. Only a finishing plant employing 780 people remained on the site in 2001.[21] First Minister Rhodri Morgan announced to the Welsh Assembly on 30 January 2002 that the rail link between Ebbw Vale and Cardiff would be reopened. Morgan said it would be part of a "package of measures to offset hundreds of steel job losses at the Corus plant". At the time, the Assembly Government's financial commitment was estimated at £7 million over two years, the project cost was estimated at £15 million and the line forecast to open in 2004.[29]

Proposals for the Ebbw Valley line, forecast to cost £27.2 million, were unveiled to the public in January 2003. The scheme was to provide an hourly service to Cardiff beginning in 2005, followed by an hourly service to Newport beginning in 2009. The display included artists' impressions of the six new stations, envisaged to be built at Ebbw Vale Parkway Victoria, Llanhilleth, Newbridge, Crosskeys, Risca and Rogerstone.[30] Proposed stations at Crumlin and Ebbw Vale Centre were shown in the Rail Atlas Great Britain and Ireland 11th edition, published 2007.[31] The project was forecast to cost £28,583,544 in October 2003.

Revival works programme[]

Template:Ebbw Valley Line (Later Stages) Work to restore the passenger service to the line took place between 2006 and 2008. The scheme was part of the response to the closure of Corus' Ebbw Vale steelworks in 2002, and the resulting economic downturn in one of Wales' most deprived areas.[32] The project was led by Blaenau Gwent County Borough Council and supported by Caerphilly County Borough Council, Newport City Council, the Welsh Assembly Government and Network Rail.[33] Capita Symonds project managed the scheme and the project contractor was Amey Rail, a subsidiary of Amey plc.

A start of main works event was held in Crumlin on 28 September 2006 and was attended by Welsh Assembly Members Andrew Davies (then Welsh Assembly Minister for Enterprise, Innovation and Networks), Irene James and Trish Law, the leaders of Blaenau Gwent and Caerphilly County Borough Councils, local councillors, officers and project stakeholders. The event marked the start of major works on the scheme with a demonstration of a new rail ballast cleaner.[20] The works upgraded the existing track to passenger standard, and included new colour light signalling, level crossing renewal and the reinstatement of Template:Convert of double track, providing a point where trains could pass each other. Six new stations and eight new Template:Convert long platforms were constructed.[11] Services were originally expected to begin in the summer of 2007.[32]

A report to Blaenau Gwent council in March 2008 showed that on completion, the project was more than £8.4 million over the original budget.[34] Funding came from three sources. The European Regional Development Fund's Objective One structural funds provided £7.5 million through the Welsh European Funding Office, Corus Steelworks Regeneration Fund £7 million and the Welsh Assembly Government provided the balance.[35][36] By January 2010, the total project cost, including the line extension to Ebbw Vale Town, had risen to an estimated £32.6 million.[37]

The restoration scheme was named Welsh Project of the Year by the Royal Institute of Chartered Surveyors in 2009.[33] The railway had been shortlisted in the community benefit category, along with the Royal Society for the Protection of Birds' Newport Wetlands Reserve and Swansea's Canolfan Gorseinon Centre.[38]

Restoration of passenger service[]

File:DMU150 yn yr orsaf Parcffordd Glyn Ebwy 2010 2.JPG

Arriva Trains Wales Class 150 DMU
at Ebbw Vale Parkway

Passenger train services were restored to the line after a gap of 46 years, on 6 February 2008, between a new station at Ebbw Vale Parkway (close to the site of the original Victoria station) and Cardiff Central.[39][40] The first train of the restored service left Cardiff Central for Ebbw Vale Parkway at 06:35 on Wednesday 6 February 2008. The first train to run in the opposite direction left five minutes later, packed with dignitaries for the official opening. Deputy First Minister Ieuan Wyn Jones opened the line along with Blaenau Gwent County Borough Council's former Labour leader Hedley McCarthy. The first train from Ebbw Vale Parkway was waved off by local residents, who welcomed the link as a positive contribution to the valley's long term regeneration.[39]

Celebrations had been due to take place on 14 December 2007 to mark the line's official opening. Arrangements included school choirs, brass bands, and plaques unveiled at each station by officials and dignitaries travelling the route between Rogerstone to Ebbw Vale. The ceremonies were cancelled two days before the scheduled reopening, as the project had not been finished on time due to "safety and engineering issues". Network Rail had confirmed in November that the new track had been tested successfully.[41][42] After a final inspection on 16 December 2007 confirmed outstanding issues had been resolved, the track was handed over to Network Rail by Blaenau Gwent council. Network Rail and Arriva Trains Wales then arranged route familiarisation training for train drivers before the new service could be introduced. Driver training began on 18 December 2007.[43][44]

Environmental issues delayed construction of two of the line's new stations. Colonies of slow worms, which has protected species status in the United Kingdom, were discovered near the tracks at the sites of Llanhilleth and Crosskeys stations. The lizards had to be moved to a safer place.[45] Llanhilleth and Crosskeys stations opened on 27 April 2008 and 7 June 2008 respectively.

Route[]

Template:Ebbw Valley Line RDT The Ebbw Valley Railway is a branch line of the Great Western Main Line.[46] Predominantly single track, the line runs Template:Convert between Ebbw Valley Parkway station (where southbound journeys to Cardiff Central begin, and northbound journeys end), in the northeast of the mountainous South Wales valleys, and the South Wales Main Line.[11][47] The track runs mainly south and southeast, following the deep-sided Ebbw River valley. The line is heavily curved along most of its route and has gradients of up to 1 in 65.[10][48] Before the project to restore passenger services began, these conditions caused a maximum line speed on the line for freight services of Template:Convert.[10] Extensive track re-canting has enabled the maximum line speed to be increased to Template:Convert.[10]

Ebbw Valley Parkway station is Template:Convert south of Ebbw Vale town centre and provides car parking and cycle storage. Buses pick up and set down in the station car park.[49] From Ebbw Valley Parkway the line is single track, facing south–southeast for the Template:Convert to its first stop at Llanhilleth. It runs past the villages of Cwm, where a new station is proposed, and Aberbeeg, which had proposals for a station included in an early plan.[26][50] Proposals to reconstruct the spur running from Aberbeeg to Abertillery are being considered.[11][51] The line winds south from Llanhilleth for Template:Fraction miles (4.5 km), past the village of Crumlin, to the next station at Newbridge, at the eastern end of Newbridge town centre. Newbridge station provides Park and Ride car park and bus interchange facilities.[52] To enable the additional service between Ebbw Vale and Newport to begin dual track would need to be laid and second platforms constructed at Llanhilleth and Newbridge stations, allowing trains to pass each other.[53] The line to Crosskeys, Template:Fraction miles (5.2 km) south of Newbridge, passes the village of Abercarn, another site that had proposals for a station included in an early plan.[54] At Crosskeys the line changes direction from south to southeast for its remaining Template:Convert to the South Wales Main Line, continuing to follow the Ebbw Valley, past the confluence of the Ebbw River and the Sirhowy River. Crosskeys station has two platforms, one for northbound services and one for southbound. It is the only station on the Ebbw Valley Railway with no car parking facility, although public car parking is available nearby. The track is doubled from Crosskeys to Risca, providing a passing loop for Template:Convert.[10][55] Risca and Pontymister station, Template:Convert southeast of Crosskeys, is in central Risca; the village of Pontymister is immediately to its southeast. It has two platforms, cycle lockers, a pick up/set down area near the northbound platform and a 94-space car park.[56] Rogerstone station is the last southbound halt on the Ebbw Valley Railway. It is Template:Fraction miles (2 km) southeast of Risca and Pontymister station, and Template:Fraction miles (6 km) northwest of the South Wales Main Line. The station has one platform: the line reverts to single track after having passed Risca. Near the platform is a pick up/set down lay-by. Rogerstone station's car park has 64 spaces.[57]

The Ebbw Valley Railway meets the Great Western's South Wales Main Line branch, which runs on the coastal plain between the cities of Cardiff and Newport, at a triangular junction about Template:Fraction miles (2.4 km) southwest of Newport station. The line splits at Park Junction in the west; one section passes through Gaer Tunnel to form a north-facing connection with the main line at Gaer Junction, allowing trains to travel to Newport. The other section meets the main line at the south-facing Ebbw Junction and allows trains to reach Cardiff Central station, Template:Convert to the southwest.[58]

Proposed additional services[]

A second hourly service to Newport is proposed for the line. A South East Wales Transport Alliance (Sewta) report in 2006 noted that additional infrastructure work would be required to enable the service to become half-hourly (one train running to Cardiff and another to Newport). An additional seven miles (11 km) of double track would be needed between Aberbeeg Junction and Crosskeys and additional platforms at Newbridge and Llanhilleth stations would be required.[59] According to Network Rail, the points system at Gaer junction would need to be replaced before the line could be linked from Rogerstone station to Newport station. Major resignalling works would also need to be carried out. Passenger trains travel faster than for freight trains, so the signals need to be further apart.[60] The Welsh Assembly Government announced in July 2009 that the relevant works to enable direct trains between Ebbw Vale and Newport would be complete by 2011.[61] Work on the track at Gaer Junction, Newport – connecting the Ebbw Valley Railway to Newport – had been scheduled for completion by October 2010,[37] but no decision on the link will now be made before March 2011.[62]

Rebuilding the branch to Abertillery, to replace the shuttle bus service, has been planned. The proposal for a new station and track (which would need to be re-laid for Template:Fraction miles (3 km) between Aberbeeg and Abertillery), is not included in the Welsh Assembly Government's National Transport Plan.[51][63][64]

A feasibility study and further design work for a new station at Ebbw Vale Town has been commissioned by the Welsh Assembly Government. The proposed station on the former Corus steelworks site, which closed in 2002, is a mile north of the line's current terminus, Ebbw Vale Parkway, and forecast to cost £6.5 million.[37]

Passenger volume[]

Template:GBsta-u

See also[]

References[]

Notes[]

  1. Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. 4.0 4.1 Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. 10.0 10.1 10.2 10.3 10.4 Script error: No such module "citation/CS1".
  11. 11.0 11.1 11.2 11.3 Script error: No such module "citation/CS1".
  12. Template:Cite journal
  13. Template:Cite journal
  14. Template:Cite journal
  15. Script error: No such module "citation/CS1".
  16. Script error: No such module "citation/CS1".
  17. Script error: No such module "citation/CS1".
  18. Script error: No such module "citation/CS1".
  19. Script error: No such module "citation/CS1".
  20. 20.0 20.1 Script error: No such module "citation/CS1".
  21. 21.0 21.1 Script error: No such module "citation/CS1".
  22. Template:Harvnb
  23. Template:Cite book
  24. 24.0 24.1 Script error: No such module "citation/CS1".
  25. Script error: No such module "citation/CS1".
  26. 26.0 26.1 Template:Harvnb
  27. Template:Harvnb
  28. Script error: No such module "citation/CS1".
  29. Script error: No such module "citation/CS1".
  30. Script error: No such module "citation/CS1".
  31. Template:Cite map
  32. 32.0 32.1 Script error: No such module "citation/CS1".
  33. 33.0 33.1 Script error: No such module "citation/CS1".
  34. Script error: No such module "citation/CS1".
  35. Script error: No such module "citation/CS1".
  36. Script error: No such module "citation/CS1".
  37. 37.0 37.1 37.2 Script error: No such module "citation/CS1".
  38. Script error: No such module "citation/CS1".
  39. 39.0 39.1 Script error: No such module "citation/CS1".
  40. Script error: No such module "citation/CS1".
  41. Script error: No such module "citation/CS1".
  42. Script error: No such module "citation/CS1".
  43. Script error: No such module "citation/CS1".
  44. Template:Cite journal
  45. Script error: No such module "citation/CS1".
  46. Script error: No such module "citation/CS1".
  47. Script error: No such module "citation/CS1".
  48. Template:Cite journal
  49. Script error: No such module "citation/CS1".
  50. Script error: No such module "citation/CS1".
  51. 51.0 51.1 Script error: No such module "citation/CS1".
  52. Script error: No such module "citation/CS1".
  53. Script error: No such module "citation/CS1".
  54. Script error: No such module "citation/CS1".
  55. Script error: No such module "citation/CS1".
  56. Script error: No such module "citation/CS1".
  57. Script error: No such module "citation/CS1".
  58. Template:Cite map
  59. Script error: No such module "citation/CS1".
  60. Script error: No such module "citation/CS1".
  61. Script error: No such module "citation/CS1".
  62. Script error: No such module "citation/CS1".
  63. Script error: No such module "citation/CS1".
  64. Script error: No such module "citation/CS1".

Bibliography[]

  • Template:Awdry-RailCo
  • Template:Cite book
  • Template:Cite book

External links[]

Template:Transport in Newport Template:Railway lines in Wales Template:Cardiff, Newport and the Valleys railway stations Template:Coord Template:Good article

Advertisement