The Downtown line (DTL) is a medium-capacity Mass Rapid Transit line in Singapore. It runs from Bukit Panjang in the north-west to Expo in the east. Currently, the line is Template:Convert long and has 34 stations, all of which are underground. The line is coloured blue on the rail map.

The original line was built in 3 stages, which opened in 2013, 2015 and 2017 respectively. Stage 3e, an extension of the line to Sungei Bedok, is under construction and will be completed in 2026, and Hume MRT station is planned to open in 2025. The line connects the North-Western and Central-Eastern regions to downtown Singapore.

The Downtown Line Stage 2 Extension will extend the line from its present northern Bukit Panjang terminus to Sungei Kadut (DE2 Station) via an intermediate DE1 Station which is scheduled to open in 2035, as announced in the Land Transport Master Plan 2040 and by LTA in January 2025.

This line is the fifth MRT line on the network to be opened, the third to be entirely underground, and, with 3-car trains, the second medium-capacity line after the Circle line. When fully completed in 2035, the line will be about Template:Convert long with 39 stations, and will serve more than half a million commuters daily. It will also be the longest rapid transit line in Singapore to use completely automated, driverless trains, the longest of such lines in the world and the longest rapid transit line in South East Asia. Travelling from one end to the other will take around 67 minutes. It is the second MRT line to be operated by SBS Transit after the North East line.

History[]

On 14 June 2005, the Land Transport Authority announced the Downtown Extension of the Circle Line to serve the Downtown at Marina Bay area, where an integrated resort (Marina Bay Sands) and Singapore's second botanical garden (Gardens by the Bay) was to be located. The 3.4-kilometre fully underground line was estimated to cost S$1.4 billion. Construction of the extension was slated to begin in 2007. During the construction of the North East Line at Chinatown station, platform provisions for the Downtown Extension were built to facilitate an interchange station.

A new depot, the Gali Batu Depot, is under construction at part of the former Kwong Hou Sua Teochew Cemetery off Woodlands Road to serve the line.

Stage 1[]

By April 2007, plans were finalized for the extension to connect Promenade with Bugis. The former Downtown Extension of the Circle Line was assimilated into the Downtown Line and was revamped as part of Stage 1, a 4.3-kilometre 6 station segment connecting Chinatown to Bugis stations. A new depot, the Gali Batu Depot, is under construction at part of the former Kwong Hou Sua Teochew Cemetery off Woodlands Road to serve the line.

Stage 2[]

Stage 2 of the Downtown Line was first conceptualized and announced as the Bukit Timah Line. It was supposedly a 20-kilometer line that would connect the new downtown with the Bukit Panjang, Upper Bukit Timah and Bukit Timah corridor, alleviating the heavy traffic travelling along the sector, but a full route was never released. Provisions were provided at Nicoll Highway station which would have seen the line terminating there and interchanging with the Circle Line.

However, the Nicoll Highway collapse and subsequent feasibility works deemed the old station unusable, with the new station being located in a different location. By July 2008, the Bukit Timah Line was announced to have been rerouted towards Promenade station. Construction for Stage 2 began on 3 July 2009 with a groundbreaking ceremony at Beauty World Station.

Stage 3[]

Stage 3 of the Downtown Line comprises of the northern segment of the original Eastern Region Line announced in 2001, a 40-kilometre rectangular loop that would have looped around the Jalan Besar and East Coast areas, intersecting the Circle Line and other current lines along the way and passing through Tampines, Bedok, Marine Parade, MacPherson and Kaki Bukit. The Eastern Region Line was however never built and repeatedly delayed. By 2010, it was announced that the northern segment of the original plan from Chinatown to Expo passing through the Jalan Besar area have been merged with the Downtown Line and their station locations and working names for Stage 3 were officially announced on 20 August 2010. In order to accommodate the construction of an additional station at Jalan Besar, the completion of the segment was pushed to 21 October 2017. The finalized names for the Stage 3 stations were announced on 19 August 2011.

2011 onwards[]

In August 2011, SBS Transit won the bid and was appointed to be the operator of the Downtown Line, under a new framework which would see the authority remaining the owner of the line. Final costs of building the line may reach an estimated S$20.7 billion, up more than 70% from an initial estimation of S$12 billion. In January 2013, plans for a southern extension which will run from Expo through the East Coast area, interchanging with the Eastern Region Line (now part of Thomson-East Coast Line) were announced for completion by 2025.

On 24 June 2013, work stopped on the King Albert Park, Sixth Avenue and Tan Kah Kee stations, after Alpine Bau GmbH, the previous main contractor, filed for insolvency on June 19. McConnell Dowell South East Asia (SEA) Private Limited and SK E&C (Singapore) was subsequently contracted to complete the work on the three stations. As a result of the delay, the completion of Downtown Line Stage 2 has been pushed back from December 2015 to the middle of 2016.[1]

Stage 1 of the Downtown Line began service on 22 December 2013, with its official inauguration made on the day before by Prime Minister Lee Hsien Loong.

It has been announced that Downtown Line will be extended to Xilin and Sungei Bedok. DTL3e was announced on 15 August 2014, in conjunction with the announcement of the Thomson-East Coast MRT Line. Two stations, Xilin MRT Station and Sungei Bedok MRT Station will be added to the Downtown Line, with Sungei Bedok as an interchange station with the Thomson-East Coast Line. It will add an additional 2.2 km to the line with the extension. Due in 2024, Stage 3e will join the current East West and future Thomson-East Coast lines which runs through Marine Parade.[2]

In October 2014, it was announced that Stage 2's opening would be pushed back to the first quarter of 2016. It had to be delayed when main contractor Alpine Bau went bankrupt in mid-2013.[3]

On 28 June 2015, Transport Minister Lui Tuck Yew announced that the delay caused by Alpine Bau's insolvency was "completely resolved" by the authorities and Stage 2's opening date was reverted back to 27 December 2015.[4]

Stage 3e[]

The Downtown Line Stage 3 Extension was announced on 15 August 2014. Due in 2024 initially, Xilin and Sungei Bedok MRT Station will be added to the Downtown Line, with Sungei Bedok being an interchange station with the Thomson-East Coast Line. It will add an additional 2.2 km to the line.

The East Coast Integrated Depot (ECID) will further expand maintenance and stabling facilities for Downtown Line rolling stock. Being built on the site of the East West Line’s Changi Depot, ECID will be a stacked three-tier train depot for the East West Line, Thomson-East Coast Line and Downtown Line.

In 2022, the LTA “Opening of Upcoming MRT Lines” infographic was updated to reflect the new opening year for DTL3e in 2025.

On 5 March 2024, as part of the Ministry of Transport Committee of Supply (COS) debate, the Stage 3 extension was updated to open in Year 2026 instead. Another update in the COS 2025 debate on 5 March 2025 refined the opening timeline to the 2nd Half of 2026.

Downtown Line Shuttle Service[]

Temporary rail replacement service between Bukit Panjang and Chinatown will start on 2 June 2017 (Friday) to facilitate Downtown Line later starting time. There will be a free shuttle bus that go from Bukit Panjang to Chinatown to prepare for the opening of Stage 3 on 21 October 2017.

Alternative Travel Arrangements[]

For commuters who must travel before 8.30am, you can take the existing bus services, or the DTL shuttle service.

  1. 66 which goes from Beauty World to Little India (EB) and Rochor to Beauty World (WB)
  2. 67 which goes from Bukit Panjang to Little India (EB) and Little India to Bukit Panjang (WB)
  3. 133 which goes from Bugis to Downtown
  4. 170 which goes from Bukit Panjang to Bugis

Uber[]

Get a promo code for Uber - "DOWNTOWNLINE" when you take Uber from 2 June 2017 till further notice which enjoys $2 of the fare through UberX.

Buses that will be used:*Volvo B7TL/Alexander ALX400 VLA124, VLA125, VLA127, VLA130, VLA135, VLA136, VLA137

  • Volvo B9TL Wrights VW1040, VW1056, VW1065, VW1196, VW1197, VW1201, VW1223, VW1365, VW1562 (Spare)
  • Volvo B5L Wrights VWH2003, VWH2023, VWH2030
  • Tower Transit EvoSeti VM36701, VM36702, VM36704

Incidents[]

Marina Boulevard had to be temporarily closed and traffic was diverted on the morning of June 18, 2008 after soil on a construction site next to the road sank. Urban Redevelopment Authority said the hole measured 5 metres wide and was 2.5 metres deep. It sank at about 9:10 am. This caused a hole next to the Marina Boulevard slip road leading towards East Coast Parkway. URA said the soil subsidence is located within the construction site where construction works for the common services tunnel is being carried out. No one was injured. About 25m of the rightmost two lanes on Bukit Timah Road has been closed off to traffic after a nearby drain embankment caved in on 17 January 2012 in the course of tunnelling works for the Downtown Line. LTA said that its engineers found a 14m precast segment of the Bukit Timah canal wall near the junction of Bukit Timah Road and Clementi Road dislodged, and some gaps in the ground were formed around that segment of the canal. It then stopped its tunnelling works to ensure safety and has begun to inject cement to stabilise the ground.[5]

On 11 March 2012, a worker was killed at a site between the Botanic Gardens and Stevens stations after a concrete slab fell on him. 35-year-old Masud Al Mamun was operating an excavator deep in the ground when the slab fell on him. Rescuers had to use a breaking tool kit to break a portion of the concrete slab. It took nearly five hours to reach the man lying motionless on the ground. This is the first casualty case in the construction of the Downtown Line.[6]

On 18 July 2012, two Chinese workers died after a temporary scaffolding, about four metres high, used for the construction of the new Downtown Line Bugis station subway link roof slab gave way. The incident happened at about 6:50 am. The eight other injured workers who were working on top of the structure, were sent to the nearby Raffles Hospital before rescuers arrived. They had minor injuries and five of them have since been discharged. Of the remaining three workers who were warded, one suffered from abdominal and chest injuries, while another suffered a back injury and the last had a finger injury. Seven of the injured are from Bangladesh while the eighth is from China. The Ministry of Manpower(MOM) has ordered all construction work to stop, while the Building and Construction Authority (BCA) has revoked the construction permit for the site while investigations are underway. MOM said that based on preliminary information gathered, workers were pouring concrete, also known as the casting process, into the formwork when the structure supporting the formwork collapsed. The formwork, located between the new and old sections of the station, was part of the structure being built to form the underground linkway, which is about three to four metres deep. The area affected is localised, measuring about five metres by 10 metres and the entire station is about 7,500 square metres. The Land Transport Authority said the station structure is substantially complete and structurally sound, and that the incident posed no risk to surrounding developments and the public.[7][8][9]

On 22 August 2013, the main and sub-contractor Soletanche Bachy and Koh Brothers at the construction site were charged in court over the collapse. The two companies were said to have failed to take measures to ensure that the workplace was safe and without risks to health to every person within the premises on 18 July 2012.[10]

Excavation works for the Downtown Line 2 caused a massive sinkhole on Woodlands Road on 16 March 2013. The construction destabilised the soil, which ruptured an underground water pipe. The rupture which was as wide as one of the road's lanes, appeared near West View Primary School, next to where construction work for Downtown Line 2 is being carried out.[11]

Line disruptions[]

On 22 Dec 2013, the opening day of Downtown Line 1, service was disrupted for about 15 minutes at about 12pm. It was caused by a train fault.[12] The incident happened at Bayfront station and delayed services between Bugis and Chinatown stations.[13]

On 27 Dec 2013, the power supply of the Downtown Line 1 was tripped and caused service disruption of the whole Downtown Line 1 at about 9pm. A train's detrainment door device was activated, leading to emergency brakes being applied. This resulted in a tripping of the power supply to the line, which is a safety feature of the system. It was suspected that a child accidentally activated the detrainment door device. Service was resumed at 10.10pm. 50 passengers on one train were detrained at Bayfront station. Bus bridging services were deployed for the Downtown Line 1.[13]

The incident happened on October 15 at 12.40pm, due to a broken track circuit lug between Hillview and Beauty World. The track circuit caused the DTL2 to stall, after leaving Cashew for Hillview. It had to be driven back to Cashew and all passengers were detrained safely. Train services resumed at 1.20pm.

While the fault occurred at DTL2, we decided to temporarily suspend further intaking of trains on DTL3, so as to avoid congestion on DTL2. This has affected the DTL3 Open House however, the DTL3 train was also withdrawn at the same time.

Stations[]

Main article: List of Downtown MRT Line station names

Here are the following station locations for all three stages of the Downtown Line.

Station Name Interchange/Notes First Train EB First Train WB Last Train EB Last Train WB
Sungei Kadut North South Line (U/C)
DE1
Stage 2 extension (2035)
Bukit Panjang Bukit Panjang LRT 05:40 06:49 23:35 00:49
Cashew 05:42 06:47 23:37 00:47
Hillview 05:43 06:46 23:38 00:46
Hume 05:45 06:44 23:40 00:44
Beauty World 05:47 06:42 23:42 00:42
King Albert Park Cross Island Line (2032) 05:49 06:40 23:44 00:40
Sixth Avenue 05:51 06:38 23:46 00:38
Tan Kah Kee 05:53 06:36 23:48 00:36
Botanic Gardens Circle Line 05:56 06:34 23:50 00:34
Stevens Thomson-East Coast Line 05:58 06:31 23:53 00:31
Newton North South Line 06:00 06:29 23:55 00:29
Little India North East Line 06:03 06:27 23:57 00:27
Rochor 06:05 06:25 23:59 00:25
Bugis East West Line 06:07 06:23 00:01 00:23
Promenade Circle Line 06:09 06:21 00:03 00:21
Bayfront 06:11 06:19 00:05 00:19
Downtown 06:17 00:07 00:17
Telok Ayer 06:15 00:08 00:16
Chinatown North East Line 06:13 00:10 00:14
Fort Canning 06:11 00:12 00:12
Bencoolen 06:09 00:13 00:11
Jalan Besar 06:08 00:15 00:09
Bendemeer 06:06 00:17 00:07
Geylang Bahru 06:04 00:19 00:05
Mattar 06:01 00:22 00:02
MacPherson Circle Line 05:59 00:24 00:00
Ubi 05:57 00:26 23:57
Kaki Bukit 05:55 00:28 23:55
Bedok North 05:53 00:30 23:53
Bedok Reservoir 05:51 00:32 23:51
Tampines West 05:49 00:34 23:49
Tampines East West Line 05:47 00:36 23:47
Tampines East 05:45 00:38 23:45
Upper Changi 05:42 00:41 23:41
Expo East West Line (to be converted to TEL by 2040) 05:40 00:43 23:40
Stage 3 extension (2H 2026)
Xilin
Sungei Bedok Thomson-East Coast Line (U/C)

Rolling stock[]

The rolling stock consists of Bombardier MOVIA C951 cars,[14] running in three-car formation. They will be stabled at Gali Batu Depot when it opens with Stage 2 of Downtown Line by 2016. For the period between the operation of Downtown Line Stage 1 and Downtown Line Stage 2, trains will be stabled at a maintenance facility that was built at Marina Bay as part of the Circle Line project. Kim Chuan Depot will house the Operations Control Centre for the Downtown Line until Gali Batu Depot and Changi Coast Depot is ready to be used.[15]

On 12 October 2012, the first of 11 trains for the Downtown Line Stage 1 arrived at Jurong Port. It was transported to Kim Chuan Depot to undergo testing by LTA before it was handed over to SBS Transit.[16] Template:As of, Bombardier had delivered five of the 11 trains for Downtown Line Stage 1.[17] LTA together with the operator, SBS Transit, conducted the necessary tests to ensure safety standards, functional performance and systems compatibility requirements were met before revenue service began on 22 December 2013.[18]

Services[]

Services From To Day
Eastbound Bukit Panjang Expo Weekdays (Full Route)
Saturdays (Full Route)
Bukit Panjang
Little India
Newton
Expo
Sundays
Westbound Expo Bukit Panjang Weekdays (Full Route)
Saturdays (Full Route)
Sundays (Full Route)

Train control[]

The Downtown Line is equipped with a fully automatic communication-based train control system, using a digital radio system for communication between trains and the centralised control system.[19] A fall-back signalling system, relying on conventional track-circuit occupancy detection, is included to ensure fully automatic operation and train protection independent of the radio system. Automatic platform screen doors provide safety for passengers, offering protection from arriving and departing trains.

Rationalisation[]

Implementation date Service Service changes
27 December 2015 173 Amended to serve Beauty World Stn by skipping Jln Anak Bt.
979 Introduced between Bt Panjang Temp Bus Pk and Choa Chu Kang Cres (loop) under the LTA's BSEP, serving Bt Panjang Stn.
983 Extended to loop at Jelebu Rd from Choa Chu Kang Int under the LTA's BSEP, serving Bt Panjang Stn.
24 April 2016 979M Introduced as a temporary supplementary service between Bt Panjang Temp Bus Pk and Choa Chu Kang Nth 5 (loop) under the LTA's BSEP, serving Bt Panjang Stn.
26 February 2017 973 Introduced between Bt Panjang Integrated Transport Hub and Petir Road.
21 October 2017 18 Amended to serve Godric's Hollow Stn via Tampines St 32, St 33 and St 34 in both directions.
20 Amended to serve Expo Stn via Changi South Ave 1 and Somapah Road in both directions.
118 Amended to serve Expo Stn via Changi South Ave 1 in both directions.
137 New service from Sims Place to Ubi Station, serving Aljunied, Paya Lebar, MacPherson and Ubi Stations.
293 Amended to serve Tampines East Stn via Tampines Ave 7, Tampines Ave 9, Tampines St 42 and Tampines St 45 as its eastern looping point.
298 Introduced as a feeder service from Tampines to Tampines Street 82 via Tampines Stn.
22 July 2018 979 Merged with Service 979M and amended to ply Woodlands Rd, Stagmont Ring, Choa Chu Kang Lk and Choa Chu Kang Nth 5, skipping KJE and Choa Chu Kang Dr.
979M Withdrawn.
21 July 2019 5 Amended to ply Flora Dr, Flora Rd and Mariam Way, skipping a section of Upp Changi Rd North.
30 August 2020 171 Shortened to loop at Upper Bukit Timah Road from Yishun Int.
700/A Withdrawn.
971 Renumbered from service 971E and amended to ply via Bt Panjang Ring Rd, Jelapang Rd, Segar Rd, Fajar Rd, Bt Panjang Ring Rd, Pending Rd, Petir Rd and Dairy Farm Rd, skipping Bt Panjang Rd in both directions.
971E Renumbered Service 971 and converted to rush hour trunk service.
972M Introduced as a supplementary trunk service plying as alternate route for service 972, plying Bt Timah Rd, Dunearn Rd and Newton Rd, serving Bt Panjang, Stevens and Newton Stns.
11 April 2021 67 Amended to serve Beauty World Stn via extended southbound Upp Bt Timah Rd, skipping Jln Anak Bt.
75
170
12 December 2021 22 Shortened to Eunos Bus Interchange from Tampines.
65 Amended to serve Tampines Ave 4 bidirectionally.
66 Amended to loop at Beauty World Station from Bedok.
66C Withdrawn.
506 Shortened to Serangoon Int from Upper East Coast.
3 April 2022 972M Merged with Service 971 and amended to ply Pending Rd, Petir Rd and Dairy Farm Rd, skipping Bt Panjang Rd.
4 April 2022 971 Withdrawn after merger with Service 972M.

Rationalisation[]

Route Information Routing
106 Lentor Street - Suntec City DT1 Bukit Panjang
Downtown Line
TE22 Gardens by the Bay
Upper Bukit Timah Road - Raffles Hotel DT5 Beauty World
Downtown Line
DT11 Newton
Walk
NS21 Newton
North South Line
EW13NS25 City Hall

External links[]

References[]

  1. Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".
  11. Script error: No such module "citation/CS1".
  12. Script error: No such module "citation/CS1".
  13. 13.0 13.1 Script error: No such module "citation/CS1".
  14. LTA Awards 6 Downtown Line Contracts Totalling $1.13 Billion
  15. Contract 901QP: Terms of Reference, Land Transport Authority, 9 November 2007 (tender document from www.gebiz.gov.sg)
  16. Script error: No such module "citation/CS1".
  17. Script error: No such module "citation/CS1".
  18. Cite error: Invalid <ref> tag; no text was provided for refs named The Straits Times
  19. Invensys Rail secures signalling contract for Singapore’s new Downtown Line

Template:Mass Rapid Transit (Singapore)

Template:Singapore railway lines


{{{header}}}
{{{body}}}

Template:Future developments in Singapore